Dear Ladies and Gentlemen,
as a matter of routine, we would like to provide you with an overview of current and upcoming events within our rail operations. This includes information from the area of the network operator as well as information from the environment of the connected seaport terminals.
- Signal failure in Flieden from November 17, 2026, at 6:50 p.m. until November 17, 2026, at 9:30 p.m., resulting in longer travel times due to trains being held up.
- Accident involving a person between Osterholz-Scharmbeck and Oldenbüttel in both directions from November 17, 2026, at 6:08 p.m. to November 18, 2026, at 5:10 a.m., resulting in longer travel times due to trains being held.
- Major renovation between Hanover and Berlin, combined with construction work in the Hanover area. This is causing significant downtime in the Hanover area due to overloaded infrastructure. The Hanover–Celle route was barely passable yesterday and will remain so tonight.
- Cable damage between Magdeburg and Braunschweig in both directions from November 16, 2026, at 9:27 a.m. until November 18, 2026, at 8:00 a.m. As a result, travel times will be extended due to detours.
- Signal box at risk of collapse in the Gommern area, between Trebnitz and Biederitz. Safety measures will be in effect from November 18, 2026, at 9:35 a.m. until approximately November 18, 2026, at 8:00 p.m. As a result, trains will be prevented from continuing their journey.
- Vandalism damage in Calbe Saale; as a result, the Halle–Magdeburg detour is only partially passable.
- A switch malfunction lasting several hours in Nörten-Hardenberg. Result: extended travel time.
- A storm in Bremerhaven has forced a complete temporary halt to operations.
- Dispositive inflow control in Bremerhaven has been in effect since September 3, 2026. Some trains are being denied entry into the Bremerhaven infrastructure.
- Loading delays at CT-Bremerhaven are approximately 2 hours, and at NTB approximately 5 hours.
Due to the circumstances, delays continue to occur at the seaport and inland terminals. These delays have a significant impact on the stability and punctuality of our network. We are making daily efforts to minimize the impact on your bookings as much as possible. Our scheduling department will continue to inform you of any affected bookings on a case-by-case basis. In order to avoid incorrect tours, please check the availability of the loading units before acceptance inland or at the seaport and take our advice notes and order-related information into account.
- Extension of the long-term construction work between Nuremberg, Regensburg, and Passau from February 6, 2026, through December 15, 2026. During this period, there will be two different detours with adjusted train lengths:
- Since September 16 – January 10, 2027 -> 590 m via Salzburg ->22 cars
- Due to the longer distance and increased utilization of the alternative routes, delays are to be expected. Further restrictions cannot yet be fully predicted. We will inform you separately about these. This mainly affects our services to Hungary.
For the area of seaport terminals, we would like to point out that your cooperation as a potential terminal customer is also urgently desired.
With regard to deadlines, please refer to our General Terms and Conditions GTC Delivery deadlines or fixed dates cannot be guaranteed. These presuppose unhindered transport conditions on rail and road.

Customer support
Get a quote