{"id":2812,"date":"2026-05-29T13:48:06","date_gmt":"2026-05-29T11:48:06","guid":{"rendered":"https:\/\/www.egim.eu\/?p=2812"},"modified":"2026-06-22T13:48:37","modified_gmt":"2026-06-22T11:48:37","slug":"surcharges-for-q3-2026-current-information","status":"publish","type":"post","link":"https:\/\/www.egim.eu\/en\/surcharges-for-q3-2026-current-information\/","title":{"rendered":"Surcharges for Q3 2026 \u2013 Current Information"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Please find below details of surcharges that will be applied from July 1, 2026 to September 30, 2026<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><strong>Fuel Surcharge<\/strong><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The fuel surcharge for the third quarter of 2026 is <strong>15%.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The calculation is based on the fuel price index of the Federal Statistical Office, available at:<br><a href=\"https:\/\/www.bgl-ev.de\/wp-content\/uploads\/simple-file-list\/Dieselpreisinformationen\/dieselpreisinfo-grossverbraucher.pdf\">fuel price index of the Federal Statistical Office<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The average value for the months February to April 2026 is a key indicator for the second quarter of 2026. Should you require further information regarding surcharges, please click on the <a href=\"https:\/\/www.egim.eu\/en\/services\/rail\/\">Tariff information<\/a>\u00a0button.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><strong>Energysurcharge<\/strong><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the third quarter of 2026, billing will be carried out in accordance with <strong>level 8<\/strong>\u00a0of our rail energy floater system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"565\" height=\"316\" src=\"https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng.png\" alt=\"\" class=\"wp-image-2426\" srcset=\"https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng.png 565w, https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng-300x168.png 300w, https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng-510x285.png 510w\" sizes=\"auto, (max-width: 565px) 100vw, 565px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The values are in EUR per TEU and transport direction. The calculation is based on the average index value for the months of February to April 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For an overview of the rail energy floater levels, please refer to the following link:&nbsp;<a href=\"https:\/\/www.egim.eu\/en\/services\/rail\/\">EGIM\/Rail-services<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Due to the adjustment of the feed-in tariff by the Federal Network Agency, the level of the energy surcharge may be revised. We will inform you of this, if necessary, in the coming days.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><strong>Infrastructure surcharge<\/strong><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The infrastructure surcharge will be invoiced at <strong>EUR 32.00 per TEU and transport direction<\/strong> <strong>in June 2026 and beyond<\/strong>.<br>As usual, we will notify you of any changes with one month&#8217;s advance notice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Should you have any queries, our sales team is available to assist you.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Please find below details of surcharges that will be applied from July 1, 2026 to September 30, 2026 Fuel Surcharge The fuel surcharge for the third quarter of 2026 is 15%. The calculation is based on the fuel price index of the Federal Statistical Office, available at:fuel price index of the Federal Statistical Office The [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":2088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-2812","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/comments?post=2812"}],"version-history":[{"count":2,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2812\/revisions"}],"predecessor-version":[{"id":2815,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2812\/revisions\/2815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media\/2088"}],"wp:attachment":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media?parent=2812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/categories?post=2812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/tags?post=2812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}