{"id":2763,"date":"2026-05-27T15:30:56","date_gmt":"2026-05-27T13:30:56","guid":{"rendered":"https:\/\/www.egim.eu\/?p=2763"},"modified":"2026-05-27T15:30:56","modified_gmt":"2026-05-27T13:30:56","slug":"egim-i-newsletter-i-current-situation-in-railtraffic-i-nr-22_2026","status":"publish","type":"post","link":"https:\/\/www.egim.eu\/en\/egim-i-newsletter-i-current-situation-in-railtraffic-i-nr-22_2026\/","title":{"rendered":"EGIM I Newsletter I Current Situation in Railtraffic I Nr. 22_2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Dear Ladies and Gentlemen,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">as a matter of routine, we would like to provide you with an overview of current and upcoming events within our rail operations. This includes information from the area of the network operator as well as information from the environment of the connected seaport terminals.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Derailment on May 26, 2026, at 7:30 a.m. on the access road to the HHLA Terminal CTA. The access road was completely closed. As of today, May 27, 2026, at 12:00 p.m., the track is once again open to single-track traffic. Repair work will take place during normal operations. This will result in restrictions.<\/li>\n\n\n\n<li>Handling delays at the HHLA Terminal CTA of more than 10 hours.<\/li>\n\n\n\n<li>Track length restriction to 650 m due to repair work at the HHLA Terminal CTA. From May 21, 2026, until approximately June 4, 2026<\/li>\n\n\n\n<li>Track length restriction to 600 m in one module at the EUROKOMBI Terminal due to crane damage, expected to last until June 30, 2026<\/li>\n\n\n\n<li>Dispositive inflow control in Hamburg has been in effect since March 10, 2026. Trains are sometimes denied entry into the Hamburg infrastructure.<\/li>\n\n\n\n<li>Dispositive inflow control has also been in effect in Bremerhaven since May 10, 2026.<\/li>\n\n\n\n<li>As we previously mentioned in our newsletter, there are significant delays across the entire network due to the &#8220;Hamburg\/Hanover Quality Initiative&#8221; and the extension of the Hamburg\u2013Berlin track renewal project. The detour routes remain heavily congested.<\/li>\n\n\n\n<li>Signal failure near Wunstorf from May 27, 2026, 5:20 a.m. to 10:08 a.m.; during this time, the line was completely closed. No detour was possible.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Due to the circumstances, delays continue to occur at the seaport and inland terminals. These delays have a significant impact on the stability and punctuality of our network. We are making daily efforts to minimize the impact on your bookings as much as possible. Our scheduling department will continue to inform you of any affected bookings on a case-by-case basis. In order to avoid incorrect tours, please check the availability of the loading units before acceptance inland or at the seaport and take our advice notes and order-related information into account.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Long-term construction work between Nuremberg &#8211; Regensburg &#8211; Passau from February 6, 2026 to December 15, 2026. During this period, there will be two different diversions with adjusted train lengths:\n<ul class=\"wp-block-list\">\n<li>February 6 &#8211; June 12 -> 620 m via Landshut \/ Plattling -> 23 cars<\/li>\n\n\n\n<li>June 12 \u2013 July 11 -> 590 m via Salzburg -> 22 cars<\/li>\n\n\n\n<li>July 12 \u2013 September 16 -> 620 m via Landshut\/Plattling -> 23 cars<\/li>\n\n\n\n<li>September 16 \u2013 timetable change -> 590 m via Salzburg -> 22 cars<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Due to the longer distance and increased utilization of the alternative routes, delays are to be expected. Further restrictions cannot yet be fully predicted. We will inform you separately about these. This mainly affects our services to Hungary.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For the area of seaport terminals, we would like to point out that your cooperation as a potential terminal customer is also urgently desired.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With regard to deadlines, please refer to our <a href=\"https:\/\/www.egim.eu\/en\/gtc\/\">General Terms and Conditions<\/a>. Delivery deadlines or fixed dates cannot be guaranteed. These presuppose unhindered transport conditions on rail and road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of our regular updates, we would like to keep you informed about current events and disruptions in rail operations. These include both restrictions on rail infrastructure and developments at the associated seaport terminals.<\/p>\n<p>Here is an overview of current operational disruptions.<\/p>\n","protected":false},"author":6,"featured_media":2033,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-2763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/comments?post=2763"}],"version-history":[{"count":1,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2763\/revisions"}],"predecessor-version":[{"id":2766,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2763\/revisions\/2766"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media\/2033"}],"wp:attachment":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media?parent=2763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/categories?post=2763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/tags?post=2763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}