{"id":2642,"date":"2026-02-26T09:42:24","date_gmt":"2026-02-26T08:42:24","guid":{"rendered":"https:\/\/www.egim.eu\/?p=2642"},"modified":"2026-02-26T09:42:24","modified_gmt":"2026-02-26T08:42:24","slug":"surcharges-for-q2-2026-current-information","status":"publish","type":"post","link":"https:\/\/www.egim.eu\/en\/surcharges-for-q2-2026-current-information\/","title":{"rendered":"Surcharges for Q2 2026 \u2013 Current Information"},"content":{"rendered":"<p><strong>Please find below details of surcharges that will be applied from April 1, 2026 to June 30, 2026<\/strong><\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Fuel Surcharge<\/strong><\/span><\/p>\n<p>The fuel surcharge for the second quarter of 2026 is <strong>7%.<\/strong><\/p>\n<p>The calculation is based on the fuel price index of the Federal Statistical Office, available at:<br \/><a href=\"https:\/\/www.bgl-ev.de\/wp-content\/uploads\/simple-file-list\/Dieselpreisinformationen\/dieselpreisinfo-grossverbraucher.pdf\">fuel price index of the Federal Statistical Office<\/a><\/p>\n<p>The average value for the months November 2025 to January 2026 is a key indicator for the second quarter of 2026. Should you require further information regarding surcharges, please click on the <a href=\"https:\/\/www.egim.eu\/en\/services\/rail\/\">Tariff information<\/a>\u00a0button.<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Energysurcharge<\/strong><\/span><\/p>\n<p>For the second quarter of 2026, billing will be carried out in accordance with <strong>level 8<\/strong>\u00a0of our rail energy floater system.<\/p>\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"565\" height=\"316\" src=\"https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng.png\" alt=\"\" class=\"wp-image-2426\" srcset=\"https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng.png 565w, https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng-300x168.png 300w, https:\/\/www.egim.eu\/wp-content\/uploads\/2025\/12\/Energie-Q1-2026-eng-510x285.png 510w\" sizes=\"auto, (max-width: 565px) 100vw, 565px\" \/><\/figure>\n\n\n<p>The values are in EUR per TEU and transport direction. The calculation is based on the average index value for the months of November 2025 to January 2026.<\/p>\n<p>For an overview of the rail energy floater levels, please refer to the following link:\u00a0<a href=\"https:\/\/www.egim.eu\/en\/services\/rail\/\">EGIM\/Rail-services<\/a><\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Infrastructure surcharge<\/strong><\/span><\/p>\n<p>The infrastructure surcharge will be invoiced at <strong>EUR 32.00 per TEU and transport direction<\/strong> <strong>in March 2026 and beyond<\/strong>.<br \/>As usual, we will notify you of any changes with one month&#8217;s advance notice.<\/p>\n<p>Should you have any queries, our sales team is available to assist you.<\/p>","protected":false},"excerpt":{"rendered":"<p>Please find below details of surcharges that will be applied from April 1, 2026 to June 30, 2026 Fuel Surcharge The fuel surcharge for the second quarter of 2026 is 7%. The calculation is based on the fuel price index of the Federal Statistical Office, available at:fuel price index of the Federal Statistical Office The [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":2088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-2642","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/comments?post=2642"}],"version-history":[{"count":3,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2642\/revisions"}],"predecessor-version":[{"id":2649,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2642\/revisions\/2649"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media\/2088"}],"wp:attachment":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media?parent=2642"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/categories?post=2642"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/tags?post=2642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}