{"id":2115,"date":"2025-04-11T10:47:42","date_gmt":"2025-04-11T08:47:42","guid":{"rendered":"https:\/\/www.egim.eu\/?p=2115"},"modified":"2025-04-11T11:08:28","modified_gmt":"2025-04-11T09:08:28","slug":"upcoming-rail-closure-in-the-port-of-hamburg-2","status":"publish","type":"post","link":"https:\/\/www.egim.eu\/en\/upcoming-rail-closure-in-the-port-of-hamburg-2\/","title":{"rendered":"Current Traffic Situation and Important Customer Information"},"content":{"rendered":"<div class=\"flex shrink basis-auto flex-col overflow-hidden -mb-(--composer-overlap-px) [--composer-overlap-px:24px] grow\">\n<div class=\"relative h-full\">\n<div class=\"flex h-full flex-col overflow-y-auto [scrollbar-gutter:stable]\">\n<div class=\"@thread-xl\/thread:pt-header-height mt-1.5 flex flex-col text-sm md:pb-9\">\n<article class=\"text-token-text-primary w-full\" dir=\"auto\" data-testid=\"conversation-turn-4\" data-scroll-anchor=\"true\">\n<div class=\"text-base my-auto mx-auto py-5 [--thread-content-margin:--spacing(4)] @[37rem]:[--thread-content-margin:--spacing(6)] @[70rem]:[--thread-content-margin:--spacing(12)] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:32rem] @[34rem]:[--thread-content-max-width:40rem] @[64rem]:[--thread-content-max-width:48rem] mx-auto flex max-w-(--thread-content-max-width) flex-1 text-base gap-4 md:gap-5 lg:gap-6 group\/turn-messages focus-visible:outline-hidden\" tabindex=\"-1\">\n<div class=\"group\/conversation-turn relative flex w-full min-w-0 flex-col agent-turn\">\n<div class=\"absolute\">\n<div class=\"flex items-center justify-center\">\n<p><strong>We would like to provide you with a regular update on the current and upcoming events affecting our rail operations and the connected seaport terminals.<\/strong><\/p>\n<h2>Track Closures &amp; Service Disruptions<\/h2>\n<p>Repair work following a trackbed landslide, including a full line closure, began on April 7 and is expected to last until April 30. All trains are being rerouted via Osnabr\u00fcck, resulting in delays of 2 to 5 hours. This affects our entire network.<\/p>\n<p>On top of that, several additional incidents in the Northern region are causing further disruption:<\/p>\n<ul>\n<li>Overhead line failure between Hannover and Hamburg (near Gar\u00dfe) \u2013 route closed.<\/li>\n<li>Line closure between Hamburg and Bremen due to new embankment construction.<\/li>\n<li>Traffic between Hannover and Hamburg only possible via Celle \u2013 which has also been fully closed since last night.<\/li>\n<li>A disabled train is blocking one of the detour routes.<\/li>\n<li>Remaining alternative routes are now fully overloaded.<\/li>\n<li>A train from another rail operator was directed onto a powerless section near Bremerhaven, causing our trains to stop short of the port.<\/li>\n<li>Around 70 trains headed to Hamburg or Bremerhaven are currently waiting on the Northern network for clearance.<\/li>\n<li>These disruptions have effectively cut off the ports of Hamburg and Bremerhaven from the rail network.<\/li>\n<li>Additional shunting delays in Hamburg due to overloaded infrastructure.<\/li>\n<li>In the South, a short-notice construction site between Plattling and Passau is causing more delays.<\/li>\n<\/ul>\n<h2>Impact on Our Network<\/h2>\n<ul>\n<li>Currently, no train is running on schedule.<\/li>\n<li>Multiple train cancellations are affecting both our national and international network.<\/li>\n<li>Seaport and inland terminals are experiencing significant delays.<\/li>\n<li>Network stability and punctuality are severely impacted.<\/li>\n<\/ul>\n<p>We are doing everything we can to minimize the impact on your bookings. Our dispatch team will continue to provide case-specific updates for any affected shipments.<\/p>\n<p>Please check the availability of your loading units before delivery to seaport or inland terminals, and follow our booking information and notifications closely.<\/p>\n<h2>Further Work in May<\/h2>\n<p>Following the current trackbed repairs, additional overhead line work is scheduled through May 12, which will lead to further significant delays.<\/p>\n<h2>Note for Terminal Customers<\/h2>\n<p>Your active cooperation is important \u2013 especially in times of disruption. Please coordinate closely if you&#8217;re a terminal customer.<\/p>\n<h2>Important Legal Note<\/h2>\n<p>Fixed delivery dates and timeframes can only be guaranteed if there are no traffic restrictions. For more details, please refer to our General Terms and Conditions.<\/p>\n<p>Thank you for your attention. If you have any questions, we are happy to assist you.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"pointer-events-none h-px w-px\" aria-hidden=\"true\" data-edge=\"true\"><\/div>\n<div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"isolate z-3 w-full basis-auto has-data-has-thread-error:pt-2 has-data-has-thread-error:[box-shadow:var(--sharp-edge-bottom-shadow)] md:border-transparent md:pt-0 dark:border-white\/20 md:dark:border-transparent flex flex-col\">\n<div>\n<div class=\"text-base mx-auto [--thread-content-margin:--spacing(4)] @[37rem]:[--thread-content-margin:--spacing(6)] @[70rem]:[--thread-content-margin:--spacing(12)] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:32rem] @[34rem]:[--thread-content-max-width:40rem] @[64rem]:[--thread-content-max-width:48rem] mx-auto flex max-w-(--thread-content-max-width) flex-1 text-base gap-4 md:gap-5 lg:gap-6\">\n<div class=\"flex justify-center empty:hidden\"><\/div>\n<div class=\"relative z-1 flex max-w-full flex-1 flex-col h-full max-xs:[--force-hide-label:none]\" aria-haspopup=\"dialog\" aria-expanded=\"false\" aria-controls=\"radix-\u00abr44\u00bb\" data-state=\"closed\">\n<div class=\"absolute start-0 end-0 bottom-full z-20\"><\/div>\n<form class=\"w-full [view-transition-name:var(--vt-composer)]\" data-type=\"unified-composer\">\n<div class=\"border-token-border-xlight flex w-full cursor-text flex-col items-center justify-center rounded-[28px] border bg-clip-padding contain-inline-size overflow-clip shadow-sm sm:shadow-lg dark:shadow-none! bg-token-main-surface-primary dark:bg-[#303030]\">\n<div class=\"relative flex w-full items-end px-3 py-3\">\n<div class=\"relative flex w-full flex-auto flex-col\">\n<div class=\"relative ms-1.5 grid grid-cols-[auto_minmax(0,1fr)]\">\n<div class=\"items-top flex justify-center\">\n<div><\/div>\n<\/div>\n<div class=\"relative flex-auto bg-transparent ps-2 pt-0.5\">\n<div class=\"flex flex-col justify-start\">\n<div class=\"flex min-h-12 items-start\">\n<div class=\"max-w-full min-w-0 flex-1\">\n<div class=\"_prosemirror-parent_1e8bb_2 text-token-text-primary max-h-[25dvh] max-h-52 overflow-auto [scrollbar-width:thin] default-browser min-h-12 pe-3\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/form>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>We would like to provide you with a regular update on the current and upcoming events affecting our rail operations and the connected seaport terminals. Track Closures &amp; Service Disruptions Repair work following a trackbed landslide, including a full line closure, began on April 7 and is expected to last until April 30. All trains [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2033,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-2115","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/comments?post=2115"}],"version-history":[{"count":5,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2115\/revisions"}],"predecessor-version":[{"id":2130,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/posts\/2115\/revisions\/2130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media\/2033"}],"wp:attachment":[{"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/media?parent=2115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/categories?post=2115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.egim.eu\/en\/wp-json\/wp\/v2\/tags?post=2115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}